Web Content Display

Ayagoz Suyrly ("Agrarian credit corporation" JSC)

Project name – wool processing.

Project location – Eatsk-Kazakhstan region, Ayaguz district, Barshatas village

Project essence – equipment purchasing, full cycle for wool cleaning and production of felt and matting.

Project cost – KZT 37 million (USD 0,2 million)

Investments required – KZT 37 million (USD 0,2 million)

Production capacity  - felt 200 tons, matting 1000 tons yearly.

Project initiator - Ayagoz Suyrly ("Agrarian credit corporation" JSC).

Project type: operating

Readiness to share the project – till 50 %.

Availability of material and technical base – Production vase and store with land lot, equipment set for primary processing of wool with capacity 100kg/hour.

Current condition on the project – Company is operating, but needs assets for purchasing of wool and equipment for wool cleaning.

 

Production of woolens "POSH-Taraz" plant" Ltd.

Project name – Production of wool worsted cloth and blanket.

Project location – Zhambyl region, Taraz city, Sypatay batyr str., 8B

Project essence – Modernization and increase of production capacities of  "POSH-Taraz" plant" Ltd.

Project cost – KZT 2775 million (USD 15 million)

Investments required – KZT 2775 million (USD 15 million)

Goal – financing is necessary to finance circulating assets, acquisition of additional equipment (for production of yarn) and refinancing of current indebtedness before "Agrarian credit corporation" JSC.

Project initiator – "POSH-Taraz" plant" Ltd.

Project type - operating.

Availability of material and technical base – land lot is available with plant for production of topse, store houses.

Current condition on the project – business plan is developing, work is carried out for inclusion of this project to the program of Road Business Map-2020.

Investor's participation in the project: any forms of mutually beneficial cooperation.

 


Project name: "Factory" PPW-Taraz" LLP

I.                   General information:

1.   Cost of the project

2.   Location of the project

3.   Projectdocumentation (design documentation, detailed design documentation, design and estimate documentation, Feasibility Study, working program) available/non-available, degree of completion

567 500 000 tenge

Taraz, street Sypatay Batyr 8 b

Available, 100%

 

II.                Project Description

 

4.    Project Description

Organization of production of tops on the base of  factory of primary processing of wool (PPW) in Taraz

5.    Finalproduct (quantity per year, tons, etc.)

Tops, up to 870 tons per year

6.    Source of raw material


Agricultural commodity producers

 

7.    Market outlet (distribution area: Customs Union, PRC, etc.)

Domestic market is 50%

Export 50% (PRC)

8.    Project implementation period (roadmap)

 

October 15, 2016

9.    Planned start of construction (year)

November 9, 2009

10.              Planned launch date of the project

October 15, 2016

11.              Provision of land

                      Provided with land

12.               Availability of transport infrastructure(r/w, car)

R/w, car

13.               Possibility of communication connection

 (electricpower, water supply, canalizationand other)

Connected

14.              Availabilityofpremises(to mention size, parameters of object)

Non-residential premises (property complex (base) with a total area of 62 186.6 square meters with 13.1649 hectaresland,

Non-residential premises (office building) with a total area 1265.70 square meters, with 0,143 hectares of land.

Non-residential premises (medical center, press-packingworkshop and warehouse) with a total area of 2678.6 square meters, with a land size of 0.4318 hectares, located at the address: Taraz, st.SypatayBatyr №8 "b"

15.               Possibilities of formation of the minimum authorized capital by the Kazakhstani companies (30% from total cost of project) for attraction of financing 

Possibility of the formation by domestic companies

16.               Availability of the necessary budget funds or need for budget financing  

Non availability

17.               Total number of new created jobs

323

18.              The total number of created workplaces in the construction period

261

19.              Quota for labor

 

-

20.              Investment preferences

Partial exemption from tax duties (70% of the amount of tax revenues)

21.              Other measures of the State support

Government grants, subsidies

1) During the lending - in accordance with the state program "Business Road Map" interest rate subsidized to 7%;

2) The product subsidies based on its category;

3) In the case of the purchase of equipment - the state payment is 30% of its value)

22.               Current situation on the project

 

The reason for the backlog of designed capacity is the lack of working capital. Factory is  suspended. Currently, the work on financial improvement is held.

23.               Project implementation period. Action area plan (further action plan)

Project implementation period: October15, 2016. Start of the construction: March 2010, the end:  July 2010. Launched in October 2010, the production and marketing of the first products was in 2011.

24.               Socio-economic impact of the project

 

The creation of additional jobs in the project area. Improving the socio-economic situation in the region.

 

III.             Participants of the project :

 

 

From RK

25. Name of the company

"Factory PPW-Taraz"LLP

26. The form of participation in the project (joint venture, debt (credit), EPC (contractor))

The project was funded in the amount of 1,025,935,359 tenge.

 ("Agrarian Credit Corporation" JSC)

27. Brief description of the company

"Factory PPW-Taraz»LLP №9628-1919-LLP from 29.05.2008, BIN 060 540 004 398, the date of first registration 22.05.2006.

Primary processing of wool, production of tops

28. Contact information of CEO

"Factory PPW-Taraz" LLP, General Director – B. Momyshev

 

29. Contact person for the project

"Agrarian Credit Corporation" JSC

Corporate Lending Department,  8 (7172) 55 99 61

 

IV.              Proposals on the project Implementation

 

30.   The scheme of financing (capital investments or debt)

31.     Technological scheme (terms of delivery of equipment, technology transfer, etc.)

32.    Other proposals (if any)

33.    The need for additional investments

                                                                                                             

Borrowed funds

-

non-available

For the equipment for the production of tights, worsted fabrics and blankets (cost of equipment starts with 10 million tenge)