Ayagoz Suyrly ("Agrarian credit corporation" JSC)
Project name – wool processing.
Project location – Eatsk-Kazakhstan region, Ayaguz district, Barshatas village
Project essence – equipment purchasing, full cycle for wool cleaning and production of felt and matting.
Project cost – KZT 37 million (USD 0,2 million)
Investments required – KZT 37 million (USD 0,2 million)
Production capacity - felt 200 tons, matting 1000 tons yearly.
Project initiator - Ayagoz Suyrly ("Agrarian credit corporation" JSC).
Project type: operating
Readiness to share the project – till 50 %.
Availability of material and technical base – Production vase and store with land lot, equipment set for primary processing of wool with capacity 100kg/hour.
Current condition on the project – Company is operating, but needs assets for purchasing of wool and equipment for wool cleaning.
Production of woolens "POSH-Taraz" plant" Ltd.
Project name – Production of wool worsted cloth and blanket.
Project location – Zhambyl region, Taraz city, Sypatay batyr str., 8B
Project essence – Modernization and increase of production capacities of "POSH-Taraz" plant" Ltd.
Project cost – KZT 2775 million (USD 15 million)
Investments required – KZT 2775 million (USD 15 million)
Goal – financing is necessary to finance circulating assets, acquisition of additional equipment (for production of yarn) and refinancing of current indebtedness before "Agrarian credit corporation" JSC.
Project initiator – "POSH-Taraz" plant" Ltd.
Project type - operating.
Availability of material and technical base – land lot is available with plant for production of topse, store houses.
Current condition on the project – business plan is developing, work is carried out for inclusion of this project to the program of Road Business Map-2020.
Investor's participation in the project: any forms of mutually beneficial cooperation.
Project name: "Factory" PPW-Taraz" LLP
I. General information:
1. Cost of the project | 2. Location of the project | 3. Projectdocumentation (design documentation, detailed design documentation, design and estimate documentation, Feasibility Study, working program) available/non-available, degree of completion |
567 500 000 tenge | Taraz, street Sypatay Batyr 8 b | Available, 100% |
II. Project Description
4. Project Description | Organization of production of tops on the base of factory of primary processing of wool (PPW) in Taraz |
5. Finalproduct (quantity per year, tons, etc.) | Tops, up to 870 tons per year |
6. Source of raw material |
|
7. Market outlet (distribution area: Customs Union, PRC, etc.) | Domestic market is 50% Export 50% (PRC) |
8. Project implementation period (roadmap)
| October 15, 2016 |
9. Planned start of construction (year) | November 9, 2009 |
10. Planned launch date of the project | October 15, 2016 |
11. Provision of land | Provided with land |
12. Availability of transport infrastructure(r/w, car) | R/w, car |
13. Possibility of communication connection (electricpower, water supply, canalizationand other) | Connected |
14. Availabilityofpremises(to mention size, parameters of object) | Non-residential premises (property complex (base) with a total area of 62 186.6 square meters with 13.1649 hectaresland, Non-residential premises (office building) with a total area 1265.70 square meters, with 0,143 hectares of land. Non-residential premises (medical center, press-packingworkshop and warehouse) with a total area of 2678.6 square meters, with a land size of 0.4318 hectares, located at the address: Taraz, st.SypatayBatyr №8 "b" |
15. Possibilities of formation of the minimum authorized capital by the Kazakhstani companies (30% from total cost of project) for attraction of financing | Possibility of the formation by domestic companies |
16. Availability of the necessary budget funds or need for budget financing | Non availability |
17. Total number of new created jobs | 323 |
18. The total number of created workplaces in the construction period | 261 |
19. Quota for labor
| - |
20. Investment preferences | Partial exemption from tax duties (70% of the amount of tax revenues) |
21. Other measures of the State support | Government grants, subsidies 1) During the lending - in accordance with the state program "Business Road Map" interest rate subsidized to 7%; 2) The product subsidies based on its category; 3) In the case of the purchase of equipment - the state payment is 30% of its value) |
22. Current situation on the project
| The reason for the backlog of designed capacity is the lack of working capital. Factory is suspended. Currently, the work on financial improvement is held. |
23. Project implementation period. Action area plan (further action plan) | Project implementation period: October15, 2016. Start of the construction: March 2010, the end: July 2010. Launched in October 2010, the production and marketing of the first products was in 2011. |
24. Socio-economic impact of the project
| The creation of additional jobs in the project area. Improving the socio-economic situation in the region. |
III. Participants of the project :
| From RK |
25. Name of the company | "Factory PPW-Taraz"LLP |
26. The form of participation in the project (joint venture, debt (credit), EPC (contractor)) | The project was funded in the amount of 1,025,935,359 tenge. ("Agrarian Credit Corporation" JSC) |
27. Brief description of the company | "Factory PPW-Taraz»LLP №9628-1919-LLP from 29.05.2008, BIN 060 540 004 398, the date of first registration 22.05.2006. Primary processing of wool, production of tops |
28. Contact information of CEO | "Factory PPW-Taraz" LLP, General Director – B. Momyshev
|
29. Contact person for the project | "Agrarian Credit Corporation" JSC Corporate Lending Department, 8 (7172) 55 99 61 |
IV. Proposals on the project Implementation
30. The scheme of financing (capital investments or debt) | 31. Technological scheme (terms of delivery of equipment, technology transfer, etc.) | 32. Other proposals (if any) | 33. The need for additional investments
|
Borrowed funds | - | non-available | For the equipment for the production of tights, worsted fabrics and blankets (cost of equipment starts with 10 million tenge) |